Service / Installation Support

Installation, coordinated
like construction.

Most smart-home projects break at the seams between trades. HomeIQ sits in the seam — coordinating pre-wire, second fix, rack builds, and AV cabinetry so the drawings, BOM, and schedule stay in sync on site.

✓Pre-wire packages per unit type
✓Second-fix termination support
✓Rack & panel builds
✓Onsite supervision at key milestones
Scope an installationDownload the pre-wire guide
Rectangle-79-2.jpg

Service / Installation Support

Installation Support

Pre-wire to commission,
one coordinator.

Pre-wire packages

Standardised pre-wire kits per unit type — rough-in schedules, cable runs, conduit counts, and panel positions sized to your build program.

Second-fix termination

We coordinate second-fix terminations with the electrical sub — keypads, panel wiring, network termination — so rooms are ready for commissioning on schedule.

Rack & panel builds

AV racks and control panels built off-site and delivered ready to install, or built on site where access demands it. Labelled, photographed, and documented.

AV cabinetry & joinery

Ventilation, cable management, and service access coordinated with the joiner during shop drawings — not discovered at installation time.

The rough-in phase

Pre-wire is where smart-home installs live or die. Get it wrong and you're chasing cables through finished walls eighteen months later.

We issue pre-wire drawings and a cable schedule per unit type — sized to your build program — before rough-in. On site, we either supervise pre-wire directly or do a detailed pre-inspection before the walls close up. Mistakes get caught before drywall, not after.

The second-fix phase

Second fix is where the keypads, touchscreens, panel trim, and network hardware actually get terminated. It's also where schedule slips bite hardest.

HomeIQ coordinates directly with the electrical sub to sequence second-fix work — which rooms first, which panels when, which keypads can be live before commissioning and which need to wait. We do a second-fix walk on every project before commissioning starts, so any field issues are resolved before programming happens.

Rack builds, cabinetry, and the last 5%

The difference between a smart-home install that looks finished and one that looks unfinished is usually the last 5% — rack terminations, cable labelling, cabinet ventilation, service access, and documentation.

HomeIQ builds racks off-site where access allows — pre-terminated, pre-labelled, photographed, and ready to swap in. On site, we coordinate AV cabinetry with the joiner during shop drawings so ventilation, cable paths, and service access are designed in rather than worked around at installation time.

On-site supervision where it matters

Not every project needs full-time on-site supervision. Flagship homes with bespoke AV joinery and complex landscape lighting usually do. Multi-unit developments with repeated unit types usually don't.

We run three models: full-time on-site supervision (complex flagship projects), milestone-based site visits (standard residential), and remote coordination with your existing integrator (distributed regional work). You pick the model that matches the scope — we don't upsell you into one you don't need.

From rough-in
to commissioning-ready.

Installation support plugs into the existing construction program — rough-in, second fix, rack builds, commissioning — without adding new moving parts.

Scope an installation

01

Scope

Share drawings, unit mix, and program dates. We confirm scope, supervision model, commercial terms, and key milestones.

02

Pre-wire

Pre-wire drawings and cable schedule issued per unit type. Supervised directly or pre-inspected before walls close.

03

Second fix

Second-fix terminations coordinated with the electrical sub — keypads, panel wiring, network termination — sequenced to match the build program.

04

Rack & cabinetry

Racks built off-site where access allows. AV cabinetry coordinated with the joiner. Labelled, photographed, documented.

05

Handoff to commissioning

Second-fix walk completed, field issues resolved, system ready for commissioning. Installation phase closes, programming phase starts.

Installed at regional scale.

300+

Units deployed

6

Cities served

3

Supervision models

48h

Pre-wire turnaround

“The commercials were tight and the site discipline matched — pre-wire, second fix, and handover all landed on program. That's rare for a smart-home layer.”

Development director · Residential developer · Singapore

Scope an installation

Send us a floor plan
or a unit brief.

We respond with a pre-wire schedule, trade-priced BOM, and a supervision proposal inside 48 hours — sized to single homes, flagship builds, or multi-unit programs.

Scope an installation

Works with

HomeIQAsia

Smart home systems for Asia, designed around the way the home should feel and delivered with integrator-grade discipline.

Serving Singapore, Bangkok, Hong Kong, Kuala Lumpur, Manila, and Jakarta

Smart Home

  • The Smart Home Experience
  • Seamless Entry
  • Perfect Climate
  • Smart Entertainment
  • Outdoor
  • Dynamic Lighting
  • Cameras
  • Voice Control
  • Resource Management
  • Building a New Home

Services

  • Design & Specification
  • Programming & Commissioning
  • Installation Support
  • HomeIQ Care

Integrators

  • Architects & Designers
  • Builders & Developers
  • Become a HomeIQ Integrator

Resources

  • Product Catalogue
  • Articles
  • About Us
  • Contact
  • Shop
  • Cart

© 2026 HomeIQ Asia. All rights reserved.

About UsContactShopCart